01Application
Repair Applications Prepared mixture should be applied on the surface with a trowel as 4-50 mm. The maximum application thickness should not exceed 50 mm at a time. Wide surfaces open to the atmosphere, especially hot, dry and windy environments should be protected from external effects for 24- 48 hours. Grout Applications If there are other machines to work around the machine to be filled, it should be determined to what extent the vibrations from the environment are transmitted by observing the vibration on the surface of a container of water placed on the baseplate. If necessary, working machines should not be operated for at least 10-12 hours until the grout mortar cures. The prepared grout mortar should be poured on the surface uninterruptedly from one side of the mold, with a thickness of 4-50 mm in one layer. Two-sided casting should be avoided in order to prevent air compression in the mold. To ensure that all the cavities in the mold are filled, placement should be made using a steel wire with a hook, and vibrator should not be used. Wide surfaces open to the atmosphere, especially hot, dry and windy environments should be protected from external effects for 24-48 hours. If the exposed edges are to be broken, it can be broken after connecting the socket and the mortar mold is hard enough to be removed. Setting wedges should not be taken before 2 days. After the machine is put into operation, the looseness of nuts and bolts should be checked and tightened if necessary.