YAPIFINEConstruction Systems

Bitumen-Polyurethane Based Two Component Liquid Waterproofing Membrane

YAPIFINE HYDRA® BITUMEN PU 2C

Rapidly curing polyurethane based elastic two component liquid waterproofing material that also includes bitumen that is applied cold.

Request Product Information

Technical profile

Material data,
at a glance.

Key properties and declared technical characteristics for product selection and initial evaluation.

Colour
Black Adherence on Concrete ≥ 2 N/mm²
Brightness
Semi-gloss Tensile Strength ≥ 2 N/mm²
Mixture Ratio
1/1 (Component A / Component B) Rupture-Expansion Percentage ≥ 2000 %
Pot Life (+20°C)
30 minutes Hardness (Shore A) 35
Density (+20°C)
1 g/cm3 ± 0.02 QUV 1000 hours
Viscosity (+25°C)
3000 – 3500 cP (A+B) Crack Bridging CB2
Application Temperature
Between +5°C to +35°C Resistance to Rain R1
Temperature Resistance
200 days at +80°C Dry sudden heat at +150°C Impermeability W1
Resistance to Pressure
C2B
Drying Period (at +23°C, 55% relative humidity)
Drying Time: 2 hours Time for New Coat: 6-24 hours Through-dry Time: 7 days Reaction to Fire E

Performance

Product advantages

  • Easy to apply.
  • Adheres perfectly to almost any surface with or without a primer application creating a film of high elasticity.
  • Never causes water leakage in application area.
  • High elasticity.
  • Rapid curing.
  • Resistant against dead water and frost.
  • Prevents water vapour.
  • Has crack bridging property.
  • In a vast range of heat, heat resistance performance is between -40°C and +90°C.
  • Resistant against cold. Film maintains elasticity up to -40°C.
  • Ensures effective resistance against chemicals.
  • Also applicable as joint material.
  • Perfect mechanic features; high tensile, tear and abrasion resistances.

Application range

Areas of use

  • Water tanks (except for drinking water reservoirs)
  • Floors
  • Foundations
  • Bridge platforms
  • Cut-and-cover tunnels
  • Underneath the tiles in bathrooms, terraces and roofs
  • Concrete buildings
  • Retaining walls
  • Plaster and cement boards
  • On EPDM and asphalt membranes
  • Lighter roofs (made of metal or fibrous cement)
  • Green terraces and roofs

Use guidance

From selection
to application.

01

Application

The mixture is poured onto the surface and is then applied in a minimum of 2 layers with a brush, scraper or roller until the whole surface is covered. The second layer should be applied 12 at minimum and 24 hours at maximum after the application of the first player. The resting time between the layers should not exceed 48 hours. The tools used during the application should be cleaned within 2 hours after the application. Also applicable as one thick layer. Should be applied with a usage of 1.5 – 2 l/m².

Specification & supply

Standards, formats
and handling.

02

Packaging

  • Tin bucket of 20kg + 20 kg
04

Storage

The shelf life of the product is 12 months when stored on wooden pallets in its original packaging in dry (maximum relative humidity 60%), cool (ambient temperature between +5°C and +25°C) and moisture-free environment.